During the inspection, it was observed electrical conduits are installed directly above the form-work ply and not between the two layers of reinforcement this needs a quick fixture to proceed with casting.
Electrical conduit cover to concrete is not proper.
Electrical conduit cover to concrete is not proper.
Cover to the electrical conduit is not proper
Cover to the electrical conduit is not proper.

